4 December 2025 Release

Activity List View (ALV) Updates

  • Filters, grouping, and sorting now remain as set and no longer reset to default after editing an activity.
  • Users can no longer drag items on the Gantt, preventing confusion since dragging did not update the database.
  • Columns now display Start Date before Finish Date, with default sorting on Finish Date.
  • Fixed an issue where certain Gantt bars appeared on incorrect dates.

Activity Flow Diagram (AFD) Updates

  • Legacy “process start/finish” references no longer appear in predecessor/successor lists when activities are expanded from the Library.
  • Added “Unassigned” as a master data filter option, allowing users to identify all activities lacking assignments (similar to how they appear in the Unassigned swimlane).
Improvements 

1 December 2025 Release

Performance Enhancements

  • Ongoing improvements continue 1–2 times per week as we move toward targeted system performance levels

Gantt Visualization Upgrade

  • Switched to the Bryntum Gantt viewer for enhanced Gantt chart graphics, responsiveness, and functionality

Commitment Plan Improvements

  • Updated “Show Completed” filter so it no longer affects Completed (Pending) activities

Standard Process Library

  • Added the ability to delete activities directly within the Standard Process Library

Endeavor-Level Master Data

  • Introduced Endeavor-level master data configuration (see: Org Settings → Master Data → Endeavor)

Activity Flow Diagram Enhancements

  • Show Hidden Predecessors/Successors: In Manual Mode, users can now right-click the cards and select “Show Hidden (# Levels)” to reveal activities hidden by filters. These cards will appear on the diagram even if they conflict with currently applied filters.

Card Rendering & Zoom-Based UI Optimization

  • New zoom-based rendering thresholds for faster performance and cleaner visuals:
    • < 50% zoom: cards show title only
    • < 25% zoom: cards hide all text/icons, showing only color fill and border
  • These defaults improve rendering speed and reduce clutter when zoomed out; custom thresholds will be available in a future update
Improvements 

14 November 2025 Release

Endeavor Creation - Org Admin users can create their own endeavors in their Organization

User Experience Improvements

  • After refresh, the system now restores the user’s last viewed layout, including manual settings, filters, swimlanes, color codes, and endeavor context
  • Endeavor Team Name now automatically updates when the Endeavor Name is changed (refresh to apply on cards)

Activity Flow Diagram Enhancements

  • Fixed issue preventing arrow deletion in Manual Mode; arrowheads now consistently display

Activity List View (ALV) & Export

  • Simplified duration, start, and finish date displays in both ALV and Excel export for easier reading

User Menu Update

  • Added “Service Desk” option in the dropdown menu when users click their own initials

7 November 2025 Release

Card Layout & Display Enhancements

  • Added a third line of text to all cards for more visible information
  • Reduced white space and rearranged icons for a more compact layout
  • Year added to milestone date displays for clearer context
  • Adjusted text sizing for improved readability
  • Replaced “Team” with “Responsible Member” as the visible field on cards

Milestone & Activity Spacing

  • Reduced milestone size and further condensed spacing between cards for a streamlined view

Commitment Plan Updates

  • Added functionality to mark items as “Not Completed as Planned / Ongoing to the Next Plan” directly from the Active Plan list

Search Function Fix

  • Resolved issue preventing nodes or activities that were off-screen from appearing in Go-To Activity ID results
Improvements 

31 October 2025 Release

Performance Improvements

  • Noticeable speed upgrade — additional performance enhancements will roll out throughout November.

Master Data Enhancements

  • Added new field types: Open Text (up to 200 characters), Number, Percent, Date, and Time Scale — expanding beyond the previous single-select and multi-select options. The new Time Scale feature allows that master data field to be applied in the time scale swimlane, supporting non-date driven work processes and plans

Commitment Plan Updates

  • Implemented auto-save logic for smoother workflow.
  • Milestones now color-filter and metrics are calculate using the later of projected or target dates, providing a more accurate view of progress.

Activity List & Notifications

  • Updated email notifications to include activity list and metric changes.
  • Planned vs. actual duration fields are now separated in both the database and Activity List View (ALV).

User Interface & Usability

  • Standardized all date input fields to the DD-MMM-YYYY format.
  • Removed “bonus bridges” for a cleaner diagram display.
  • Reduced spacing between activities to approximately two-thirds of the previous layout for better visibility.
  • Fixed arrow deletion bug — arrows can no longer be accidentally removed.

Printing Enhancements

  • Updated print logic so the entire diagram appears in print preview, even if users haven’t panned or zoomed to view all areas.
  • Note: this fix increases print preview load time for very large diagrams. Small diagrams load instantly, while large ones (≈500 visible activities) may take several minutes to render. Performance for this feature will improve further in November updates.
Improvements 

22 October 2025 Release

1. Activity Flow Diagram Enhancements

  • Added Isolate Selected option to focus on specific activities for clearer visualization

2. Activity List View (ALV) Improvements

  • Expanded List View to include all date fields — early, late, projected, and committed

3. Commitment Plan Updates

  • Simplified “Proposed” metrics and added tooltips for easier interpretation

4. Master Data Enhancements

  • Improved handling of required fields — when fields are newly set to “required,” existing activities are now tagged as Unassigned (instead of defaulting to a value) until updated by the user
  • Renamed the “Other” swimlane to “Unassigned” for consistency

5. Authorization Rules (released last weekend)

  • Completed implementation for assigning Admin, Moderator, Contributor, Viewer, and Following roles within settings and activities
  • Tooltips will be added in early November
Improvements 

16 October 2025 Release

1. Activity Domain Improvements

  • Added Hide Selected option to the right-click menu in the Activity Flow Diagram for easier management of complex views
  • Enhanced Manual Mode — now disables all dynamic auto-functions (layout, filtering, and swimlane movement).
    • Displays a banner to warn that activities may be placed in non-corresponding swimlanes
    • Includes a Reapply Dynamic Mode option to restore automatic placement
    • Works with Saved Placement save / override / load functionality

2. Activity List View (ALV) Enhancements

  • Introduced Excel Export for quick data extraction and reporting
  • Added ordering and filtering for master data fields to improve data organization and visibility
Improvements 

10 October 2025 Release

1. Commitment Plan Enhancements

  • Added milestones to the list of unstatused activities
  • Refreshed “in-progress cycle” metrics for up-to-date performance tracking
  • Swimlane Improvements
    • Swimlanes now automatically re-order when master data is re-ordered
    • Arrows are now displayed in front of swimlane graphics for better visibility and selection when swimlanes are turned on

2. Standard Process Library (SPL)

  • Updated to include organization-required fields
  • Improved logic for copying parent activity attributes when expanding a standard process
  • Parent activity title now editable when expanded, maintaining lineage of the original activity’s title
  • User Interface Updates
    • “Import from Library” button now fully functional
    • Hidden “Details” section across all pop-ups for a cleaner view

3. Authorization & Notifications

  • Preferences for user notifications implemented
  • Note: Completion of Authorization Rules (admin, moderator, contributor, viewer, and following roles) is in progress
Improvements 

29 September 2025 Release

  • Performance Enhancements – faster load times in the Activity Flow Diagram for large endeavors
  • Copy/Paste Improvements – removed unnecessary “Copied from...” text for cleaner activity labels
  • Link by Activity ID – quickly connect activities using their unique IDs
  • Ongoing to Next Plan Updates – improved UI and rules for carrying forward activities; option is disabled for cases that cannot logically continue (e.g., zero-duration activities or those with incomplete predecessors). A rule fix related to planned cycle finish dates will be included in the next release.
  • Milestone Enhancements – milestone cards now show target vs. projected icons, plus indicators for associated tasks, content, and commitment plans
  • Bug Fix: SNET Constraint – resolved issue where constraints were erased during bulk-editing of activities
  • Color-Coded Selection Arrows – arrows now receive a "highlight" color when selected for clearer visualization
Improvements 

23 September 2025 Release

Activity Domain

  • Milestone Date Change Reason – added warnings and request prompts when changing milestone Target dates
  • Diagram Refresh Fix – diagrams now reload correctly defaulting to the top-left corner
  • Excel Import – new functionality to perform developer-assisted bulk import of activities from Excel; performance improvements for large endeavors are in progress
  • Milestone Date Tracking – system now captures both weekly and end-of-plan milestone target dates and projected dates for improved tracking and reporting going forward
Improvements 

18 September 2025 Release

Activity Domain

  • Nested Swimlanes – create multi-level swimlanes by master data or other attributes for deeper visualization
  • Swimlanes by Company and Responsible Party – organize activities by Company and Responsible Party fields
  • Copy & Paste – new feature to duplicate one or more activities directly in the flow diagram utilizing ctrl+c and ctrl+v